We’ve shown you the fun graffiti inside 1 WTC and a Google Glass video of our trip up to the 90th floor. Now, here are still shots from our exploration of the site.
There’s a temporary landing on the 90th floor for the external elevator:
As you can imagine, the 90th floor landing is completely grated, here’s a view down below:
Interior construction on the 90th floor:
On the landing:
Temporary elevator banks on the 90th floor:
In the elevator:
View from the 64th floor:
View looking west over the World Financial Center:
Interior construction on the 64th floor:
The lobby elevator banks already have marble panels:
View looking up 1 WTC:
When the WTC site is completed, Fulton Street (shown here) will be extended to meet West Street:
When completed Greenwich Street will traverse the site, intersect the Fulton Street extension (below) and reconnect with West Broadway. Cortlandt and Dey will return as pedestrian walkways.
See more coverage on the World Trade Center:
Calatrava Transporation Hub Photos
Calatrava Transportation Hub Construction Video
1 WTC Construction Video
Behind the Scenes at 1 WTC and Calatrava Hub in June
9/11 Memorial
Get in touch with the author @untappedmich.